Welcome to Canada's #1 Hobby Electronic Store!
UNIVERSAL-SOLDER is Canada's favourite source for hobby electronics. We provide parts, kits and modules for hobby and education.
UNIVERSAL-SOLDER is the leading manufacturer of Programmable Logic Controller DIY kits and atomic clock receivers for North America and Europe.
UNIVERSAL-SOLDER offers an exclusive discount program for STEM and technology educational in Canada and the USA.
For best experience visit our website from a desktop browser. This site is not fully optimized for mobile browsers.
On Sale: “Everything Display” – Buy 2 (of the same item) and get 1 Free (of the same item).
-
8×8 RGB LED Matrix with 64 x WS2812B RGB – fully addressable
0 out of 5 -
-
4 digit LED 7-segment display, serial interface, TM1637
5.00 out of 5 -
ST7789 TFT IPS Display – 1.3 inch – 240×240 pixel – SPI Interface
5.00 out of 5 -
-
8-digit serial LED 7-segment display MAX7219 – 9.5mm
0 out of 5 -
-
WEMOS D1 Mini 8×8 Addressable RGB LED Shield
0 out of 5 -
24 x WS2812B RGB LED Ring, fully addressable, 86mm
0 out of 5 -
OLED Display 0.96 inch 128×64 with SPI interface – 3-5V
0 out of 5
New Arrivals
-
CANADIUNO ESP32-C6 Development Module with 4MB Flash Wi-Fi 6 + BT BLE
0 out of 5 -
-
-
-
CANADUINO® UNO R4 Minima 256kB Flash – 48MHz (compatible with Arduino)
0 out of 5 -
CANADUINO® UNO R4 WiFi 256kB Flash – 48MHz (compatible with Arduino)
0 out of 5 -
Espressif ESP32-C6-DevKitC-1 V1.2 with 8MB SPI Flash Wi-Fi 6 + BT BLE
0 out of 5 -
-
-
2 x Desoldering Wick – Braid (2mm and 3.5mm) 1.5m each
0 out of 5 -
-
-
-
DC Voltmeter Panel Mount 0.56 inch LED 4.5-30V
0 out of 5 -